Electrical work redefined

We empower the electrical contractor to rapidly deliver complex work at scale and cost enabling sustainable breakthrough performance.

Jackson West Medical Center

Transforming the electrical construction industry 

Decades long poor productivity growth, tighter build times, increased project scope, complexity, and costs coupled with unique electrical trade challenges demand a novel approach. The PWR-On™ Solution is the result of our relentless pursuit to effectively and efficiently deliver electrical work to the most demanding commercial projects.

Begin your transformation with us

We believe that an innovative solution driving unparalleled improvements in productivity, efficiency and profitability requires a holistic approach to project delivery. Grounded in enterprise-wide best practice business processes and procedures, workflow enabled Manufactured Construction Management (MCM) tools, BIM/VDC and other digital technologies, PWR-On™ delivers a fully integrated off-site manufacturing facility transforming the manner by which work is executed in the field.

Project centric manufacturing


Standardization, modularization, and specialization embedded throughout all facets of the PWR-On™ framework is central to the efficient and timely fabrication of off-site manufactured (OSM) work ready for timely field deployment.

Unwavering field focus


Readily available off-site manufactured (OSM) work and the efficiency with which it is installed combine to redefine the work schedule. Optimized work sequencing that firmly aligns all project stakeholders’ goals and objectives while effectively increasing scarce and indispensable workforce capacity is realized.

Proven experience


Purpose built and battle tested for the largest, most complex and demanding projects spanning healthcare, data center, education, hospitality, and public works sectors, PWR-On™ accelerates electrical design, digital construction and fabrication of off-site manufactured (OSM) work transforming field project delivery.

University of Miami Knight Recital Hall

Evolved planning and visibility


Traceable off-site manufactured (OSM) work, scheduled in units of assemblies per day, is monitored for progress and quality empowering management with real-time unparalleled visibility into assigned and completed work, business intelligence and analytics.

Enterprise-wide OS


Current™ - live work schedule manages all project work packages from electrical design, through coordination, digital construction and off-site manufacturing in support of the field schedule. Ever changing field requirements reprioritize work packages throughout the business value chain.

Instinctively sustainable


Productivity improvements, eliminated waste and reduced delivery times are just some of the efficiencies afforded by pivoting to a manufacturing centric construction model.

Future proof


We view digital construction designed for off-site manufacturing and the associated knowledge base as prerequisites to be well positioned for the adoption of emerging technologies in the accelerating robotics and AI fields in support of sustainable breakthrough performance and competitive advantage.

Advantages of the PWR-On™ solution


Simplified work

95% of project basic materials are processed off-site in a controlled manufacturing environment reducing material and labor costs. Costs associated with material handling, storage, tracking, waste, over/under stock, damage and theft in the field are virtually eliminated. Field skill level to work alignment and off-site manufacture (OSM) work specialized teams drive additional labor cost reductions.

10x

more productive

Streamlined material and labor

With over 70% of the work manufactured off-site, the speed with which projects are constructed in the field is significantly increased. Additional labor efficiencies from reduced site congestion, out of sequence work, rework, lack of information, tools, equipment and materials are also realized.

25%

reduced cost

Quality performance

Complex work is rapidly delivered at scale without compromise, ensuring the highest quality standards are achieved and maintained. Standardization, modularization, and specialization in all work from design through installation inherent in the PWR-On™ methodology is quality assured and traceable for continuous improvement.

85%

less rework

Operational liquidity

Our project centric manufacturing framework redefines the schedule of values, draw schedule and basic material procurement effectively increasing and accelerating project level operational cash flow.

20%

improved cash flow

Featured projects

Jackson West Medical Center

Miami Dolphins Training Center

Temple Beth Am